A片粗大的内捧猛烈进出AVV_国产精品成人精品久久久_狼群社区在线看片_熟女精品视频一区二区三区_任你躁一区二区久久99_97精品一区二区三区

How to realize good explosion-proof performance of liquid ammonia emergency shut-off valve?

Time:2021-09-17
Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.

How to adjust the pressure relief valve group of the concrete pump truck correctly? In the construction process, if the operators move disorderly due to their unclear understanding of the performance of each part of the concrete pump truck, it will easily lead to various faults in the operation of the concrete pump truck, which will bring a lot of inconvenience to the on-site construction. Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.


1、Overflow valve regulation

When adjusting the pressure relief valve group, first adjust the condition of the overflow valve through the following steps: first loosen the adjusting rod of the superimposed overflow valve under the electromagnetic directional valve on the main valve block, and then tighten all the adjusting rods of the unloading overflow valve on the pressure relief valve group. Remove the electromagnet plug on the main overflow valve, press the positive pump button, then slowly adjust the superimposed overflow valve, observe the reversing pressure gauge, and lock the adjusting rod if the pressure is.


2、Accumulator unloading ball valve regulation

After adjusting the overflow valve, the adjustment of the accumulator unloading ball valve is also very important. The operation steps are as follows: open the accumulator unloading ball valve, loosen all the adjusting rods of the unloading overflow valve, then close the accumulator unloading ball valve, slowly tighten the adjusting rod of the unloading overflow valve, and then observe the condition of the reversing pressure gauge. When the pressure indication is 16MPa, the adjustment can be stopped, Lock the adjustment lever.


3、Regulation rules

In the whole regulation process, because the gear pump is connected with the accumulator, the pressure changes slowly during regulation, and attention should be paid not to be too fast during regulation. After adjustment, plug in the electromagnet plug on the main overflow valve to stop pumping.

主站蜘蛛池模板: 亚洲精品视频www | 91亚洲欧美 | 久久免费看少妇高潮a片特黄网站 | 黄色一级免费视频 | 永久免费AV无码网站在线观看 | 夜夜躁日日躁 | 免费网站看v片在线18禁 | 免费一级做a爰片性视频 | 国产视频一区二区在线观看 | 久久天天躁狠狠躁夜夜 | 亚洲第一AV五码免费一区 | 欧美日本视频在线观看 | 亚洲成人激情av | 亚洲日本乱码一区二区三区 | 少妇久久久久久久久久 | av自拍偷拍 | 91热视频在线 | 免费成人午夜视频 | 未满十八18禁止免费网站 | 天堂V亚洲国产V第一次 | 91看片在线免费观看 | 成人国产午夜在线观看 | 久久亚洲精品国产精品果冻传媒 | 国产成人亚洲综合a∨婷婷图片 | 亚洲福利第一页 | 无码一区国产欧美视频 | 日本黄视频在线观看 | 欧美牲交a欧美牲交aⅴ图片 | 永久免费AV无码网站在线观看 | 国产精品视频在线看 | 欧美一区二区三区四区不卡 | aaa日本高清在线播放免费观看 | 国产一区二区三区四区五区美女 | 未满成年国产在线观看 | 亚洲韩国日本 | 亚洲AV蜜桃永久无码精品 | 亚洲靠逼网站 | 天天躁夜夜躁天干天干2020 | 成人午夜看片网址 | 综合久久久久久久久久 | 国产猛男猛女无遮无掩 |